Glossary Term: Manufacturing Change Order (MCO)
A Manufacturing Change Order (MCO) is a change order used to make a manufacturing change to a product. An MCO is not generally used to implement a design change to the product. Manufacturing change orders do not require a design change and are often accompanied by an ECO (Engineering Change Order).
To view the complete list of glossary terms, click here.

